SITE HANDOVER SHEET · SURFACE WORK
Mounting and functional checks must be complete before surface work begins. This sheet records the essential requirements for plasterboard installers and decorators; the full guide and model documents remain authoritative.
This sheet applies to plaster-finished loudspeaker and subwoofer panels. fit uses its own template-based fixing; architect sub requires finishing only around the outlet. Wood/veneer follows its own installation method.
APPLICATION REQUIREMENTS
- Installation and functional checks before filling are complete; vibration and rattling noises have been resolved.
- The factory-applied Ardex P4 primer is preserved and must not be sanded off or removed.
- Use a suitable polymer-modified powder filler for mixing, such as Ardex 828 or Knauf Uniflott; fill the perimeter joint completely and apply approximately 5 cm wide fibreglass joint tape over the transition.
- Keep the finish on the panel as thin as possible; the combined thickness of all filler coats must not exceed 2 mm.
- Observe the application, drying and curing requirements of the materials used.
FINAL CHECK
- Mounting, fixings, insulation and cable routes checked.
- Connections, polarity, channel assignment, presets and protection configuration checked.
- Functional check before filling completed; rattles resolved.
- Surface materials and coat thickness checked; surface completely dry.
- Final listening check completed; installation positions and system settings documented.